Tunneling
Super Excavators, Inc. completed our first Microtunnel project for the City of Brookfield in 2001. We have used this technology for most of our tunnels under 100" ever since. In the last four years Super Excavators, Inc. has Microtunneled over 40,000 lineal feet. We adapt our MTBM (Microtunnel Boring Machines) to the ground we are working in. Our capabilities include soils ranging from wet sands and silts/organics to cobbles/boulders and even solid bedrock. Recently Super Excavators, Inc. has purchased a pilot-tube Microtunnel system and we have set an Akkerman pilot-tube record for the 490 foot long 24" HOBAS pipe drive completed in June of 2009.
Key Benefits
Trench less Technology | Less Disruption with traffic flows | Reduced Restoration Costs | Reduced disruption relocating existing utilities | Ability to bore through all ground conditions | Environmentally friendly