Production Control and Continuous Improvement
Reconfirm the price with seller
Services of other enterprises
Description
Availability takes into account Down Time Loss and any event that stops planned production (equipment failures, material shortages and changeover time)
Availability = Operating Time / Planned production time
Performance takes into account Speed Loss (includes factors that cause the process to run at less than maximum possible speed) Examples include machine wear, substandard materials, mis-feeds, and operator inefficiency.
Performance = (Total Pieces / Operating Time) / Ideal Run Rate
Quality takes into account Quality Loss (production pieces that do not meet quality standards, and pieces that require rework)
Quality = Good Pieces / Total Pieces
Contact the seller
Production Control and Continuous Improvement

We recommend to see



