Evaporation Pond
Reconfirm the price with seller
Services of other enterprises
Description
Scope of work includes the construction of an approximate 17 Acre Cooling Tower Blowdown Evaporation Pond to receive a waste stream from the Cooling Tower. Scope included site preparation, connection to site access roads, drainage improvements, earthwork, installation of primary and secondary flexible membrane liners and LDCRS (Leak Detection, Collection and Recovery System), installation of CPP and HDPE piping with valve and valve box and removal of all spoil materials.
Contact the seller
Evaporation Pond